Project highlights, About intro, and no em dashes #3

Open
karma wants to merge 1 commit from content/project-highlights into main
Owner

What changed

  • Project highlights: Raytracer, VALORANT Instalocker, Discord bot and portfolio cards each get up to three concrete details, taken from the actual repos and READMEs. They are hidden below sm so the pinned stage stays within a phone viewport. GlobalSort GUI has none because its source wasn't available.
  • Structured data: a projects-json-ld ItemList lists all five projects. Only the active project is in the DOM, so crawlers previously saw one of five.
  • About intro: two short paragraphs saying who Karma is, what the lab runs, and a link to contact.
  • No em dashes: removed from page copy, title (Karma · Tess Dev), meta, OG and JSON-LD descriptions. The e2e title assertion and the repo-stat placeholder check were updated to match.
  • Sitemap: siteLastModified bumped to 2026-11-12.

Why

The site was technically solid (SEO tags, security headers, alt text, clean console) but the project cards said very little about what was actually built.

Reviewer notes

  • Please check the highlight wording in lib/data/projects.ts for accuracy.
  • Unit tests and typecheck pass for these files. E2E was not run locally because untracked Tess OS work in the checkout breaks the production build; CI should run it cleanly on this branch.
  • Checked in a clean headless Chromium: no em dashes rendered, no hydration errors.
## What changed - **Project highlights:** Raytracer, VALORANT Instalocker, Discord bot and portfolio cards each get up to three concrete details, taken from the actual repos and READMEs. They are hidden below `sm` so the pinned stage stays within a phone viewport. GlobalSort GUI has none because its source wasn't available. - **Structured data:** a `projects-json-ld` ItemList lists all five projects. Only the active project is in the DOM, so crawlers previously saw one of five. - **About intro:** two short paragraphs saying who Karma is, what the lab runs, and a link to contact. - **No em dashes:** removed from page copy, title (`Karma · Tess Dev`), meta, OG and JSON-LD descriptions. The e2e title assertion and the repo-stat placeholder check were updated to match. - **Sitemap:** `siteLastModified` bumped to 2026-11-12. ## Why The site was technically solid (SEO tags, security headers, alt text, clean console) but the project cards said very little about what was actually built. ## Reviewer notes - Please check the highlight wording in `lib/data/projects.ts` for accuracy. - Unit tests and typecheck pass for these files. E2E was not run locally because untracked Tess OS work in the checkout breaks the production build; CI should run it cleanly on this branch. - Checked in a clean headless Chromium: no em dashes rendered, no hydration errors.
content: project highlights, About intro, no em dashes
Some checks failed
CI / test (pull_request) Failing after 1m15s
CI / docker-verify (pull_request) Has been skipped
CI / docker-publish (pull_request) Has been skipped
CI / deploy (pull_request) Has been skipped
ce69ed819f
- Add concrete highlights to Raytracer, VALORANT Instalocker, Discord bot
  and portfolio cards (hidden on phones to keep the pinned stage short)
- List every project in JSON-LD, since only the active one is in the DOM
- Open About with a short intro and a link to contact
- Replace em dashes in page copy, title, meta and structured data
- Bump sitemap lastmod
Some checks failed
CI / test (pull_request) Failing after 1m15s
CI / docker-verify (pull_request) Has been skipped
CI / docker-publish (pull_request) Has been skipped
CI / deploy (pull_request) Has been skipped
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin content/project-highlights:content/project-highlights
git switch content/project-highlights

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff content/project-highlights
git switch content/project-highlights
git rebase main
git switch main
git merge --ff-only content/project-highlights
git switch content/project-highlights
git rebase main
git switch main
git merge --no-ff content/project-highlights
git switch main
git merge --squash content/project-highlights
git switch main
git merge --ff-only content/project-highlights
git switch main
git merge content/project-highlights
git push origin main
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
karma/portfolio!3
No description provided.